Vehicle Electrification Expo, 16 and 17 June 2027, NEC

Exhibition stand builder for Vehicle Electrification Expo, built for battery packs and live demos

T2 Display has designed and built bespoke exhibition stands since 2001 from our own workshop in Tamworth, Staffordshire. We build custom stands only, for spaces from 20 up to 100 square metres. Design and 3D visuals are free of charge for qualifying enquiries.

Get in touch

14 Times Tour de France Winners -- exhibition stand designed and built by T2 Display for Pinarello
01

Book your stand builder by April 2027

Vehicle Electrification Expo runs on 16 and 17 June 2027 at the NEC Birmingham, alongside Battery Cells and Systems Expo.

Work backwards from those dates and the calendar gets tight fast.

  • Design approval and the CDM declaration can take up to six weeks. That paperwork is not optional for a space only build.
  • Appoint your stand builder at least two months before the show. For June 2027, that means having someone on board in April 2027 at the latest.
  • Finished artwork is needed four weeks before the show, so around mid May 2027.

Earlier is better. If you are reading this with more than two months in hand, you have room for a proper design conversation, a look at how your hardware actually sits on the stand, and time to change your mind once before drawings are frozen. If you are inside that window, talk to us anyway and we will tell you honestly what is still possible.

02

Twenty minutes from the NEC, and what that actually buys you

Our workshop is in Tamworth, Staffordshire, about 20 minutes from the NEC Birmingham. The NEC is our home venue. In practical terms that proximity means:

  • Site visits during design. We can get to the hall and back in a morning to check your space, access routes and neighbours.
  • The build crew on site early. Short run in, no overnight travel, more hours of build time on day one.
  • Problems fixed from the workshop, not from a hotel room. If a panel needs remaking or a bracket needs welding during build up, our carpenters, electricians and fabricators are a short drive away with the machines and the materials.
  • Local storage between shows. Your stand comes back to Staffordshire, gets checked, and waits for the next event. Storage is quoted separately.

We also work regularly at the ICC and Resorts World Arena in Birmingham, Coventry Building Society Arena, ExCeL London, Olympia London and Harrogate, plus international shows. But the NEC is the venue we know best.

No Climb Products

They have never let us down and have always delivered a quality stand that meets our requirements.

Stephen Beadle, No Climb Products

03

Built for heavy hardware and live demonstration

Exhibitors at an electrification show rarely turn up with a brochure rack. They turn up with weight, and with things that need to run.

Carrying the load. Battery packs, powertrain assemblies, inverters, e-axles and test rigs are heavy and awkwardly distributed. Our in-house carpenters and fabricators build plinths, frames and steel-reinforced platforms sized to the actual item, not to a standard system. We want the weight, the dimensions and the lifting points early, so the structure is engineered rather than hoped for.

Power and cables. Live demonstrations need a considered electrical design. Our in-house electricians plan supply positions, distribution, socket locations and cable routes so that nothing trails across a walkway and nothing is improvised on site. Cable management is designed into the floor, the plinth and the wall build, not taped down on the morning of open.

Reading as engineering, not marketing. Buyers on this floor are engineers. The stand should look like it was made by people who make things: honest materials, clean joints, considered lighting on the hardware, clear sight lines to the demonstration, and graphics that support the product rather than shout over it.

Two of our real clients sit squarely in this world. Journeo and Horiba Mira are both T2 clients, and you can see that work in our portfolio.

04

Custom build only, 20 to 100 square metres

We think it is fairer to be clear up front.

T2 build custom stands only. Designed and made from scratch for one brand and one space, with no system limits on height, shape or structure. We build for spaces from 20 square metres up to 100 square metres.

We do not sell modular stands as a product line. Modular means off-the-shelf systems, pole and panel, pop-ups, aluminium frames with infill panels, pre-manufactured to standard sizes at a standard height of around 2.5m. That format genuinely suits exhibitors doing five or more shows a year on a modest budget, and it can be self-built. If that is you, a modular supplier will serve you better than we will, and we would rather say so now.

We explored modular systems many times over the years and invested in the kit. Clients kept asking for more personalisation, greater height and shape, and a more dynamic presence. So custom is what we do. Where a system component such as a light box is the right answer inside a custom build, we use it.

05

What a stand of this kind costs

No two briefs cost the same, so here are the real ranges we work in. Fabrication and build is typically around half of any contract value.

  • Fabrication and build: from 4,000 GBP at the small end, 8,000 to 20,000 GBP mid-range, up to 50,000 to 60,000 GBP on large contracts.
  • Graphics and print: typically 3,000 to 8,000 GBP mid-range. Graphics-led builds can run 12,000 to 18,000 GBP.
  • Electrics and lighting: typically 1,200 to 5,000 GBP, up to 6,000 GBP on larger builds.
  • Transport and logistics: typically 600 to 2,000 GBP.
  • Installation: typically 2,000 to 5,000 GBP depending on contract size.
  • Breakdown: typically 1,500 to 4,000 GBP. De-rigging takes nearly as much labour as build up. Storage is quoted separately.

A typical mid-range custom build totals 16,000 to 44,000 GBP. Design and 3D visuals are free of charge for qualifying enquiries, so you can see the idea before you commit to the build.

06

One team, from sketch to storage

We are a full service stand builder with a permanent in-house team of carpenters, electricians and fabricators. That means one point of contact and one set of people accountable for the result.

  • Design and 3D visuals, free of charge for qualifying enquiries
  • Build in our own Tamworth workshop
  • Graphics and print
  • Transport to the NEC
  • Installation and build up
  • Breakdown and de-rig
  • Storage between shows, quoted separately

We have been doing this since 2001 and we are an ESSA member. More than 75% of our work comes from existing clients, which tells you more about how the show week goes than any sales pitch would. Clients include Soudal, Pinarello, Dentally, Journeo, Software of Excellence and Horiba Mira. At the NEC we designed and built Lely's key UK event stand for six consecutive years, and we built the BSA Guns stand in Hall 6 at The Great British Shooting Show.

The show was previously called the Electric and Hybrid Vehicle Technology Expo, so if that is the name in your internal plan, you are in the right place.

Common questions

Your questions, answered.

When do I need to appoint a stand builder for Vehicle Electrification Expo 2027?
The show is on 16 and 17 June 2027 at the NEC Birmingham. Design approval and the CDM declaration can take up to six weeks, so a builder should be appointed at least two months before, which means April 2027 at the latest. Finished artwork is needed four weeks before the show, around mid May 2027.
Is this the same show as the Electric and Hybrid Vehicle Technology Expo?
Yes. Vehicle Electrification Expo was previously called the Electric and Hybrid Vehicle Technology Expo, and many people still search for it under that older name. The next edition is 16 and 17 June 2027 at the NEC Birmingham, running alongside Battery Cells and Systems Expo.
What size stands do you build?
We build custom stands only, for spaces from 20 square metres up to 100 square metres. If you have a smaller package or shell scheme stand, a modular supplier will suit you better than we will. Modular systems are off-the-shelf, pre-manufactured to standard sizes at about 2.5m high, and can be self-built.
Can the stand take the weight of a battery pack or powertrain unit?
Yes, if we know the numbers early. Send us weights, dimensions and lifting points and our in-house carpenters and fabricators will build plinths, frames and reinforced platforms sized to the actual item. We design the structure around your hardware rather than fitting your hardware into a standard system.
Can you supply power for live demonstrations on the stand?
Yes. We have in-house electricians, and electrics and lighting are part of the full service. We plan supply positions, distribution, socket locations and cable routes at design stage so cables are managed inside the floor, plinths and walls rather than taped down on site. Electrics and lighting typically run 1,200 to 5,000 GBP, up to 6,000 GBP on larger builds.
How much does a custom stand cost?
A typical mid-range custom build totals 16,000 to 44,000 GBP. Fabrication and build is usually around half of the contract value, with graphics, electrics, transport, installation and breakdown making up the rest. Design and 3D visuals are free of charge for qualifying enquiries.
Where are you based, and why does that matter at the NEC?
Our workshop is in Tamworth, Staffordshire, about 20 minutes from the NEC Birmingham. That means site visits during design, the build crew on site early, problems fixed from the workshop rather than from a hotel, and your stand stored locally between shows.

Tell us about your space at Vehicle Electrification Expo

Send us your stand size, your hardware and what you want visitors to do on the stand. We will come back with ideas and a clear quote. Design and 3D visuals are free of charge for qualifying enquiries. For the June 2027 edition, April 2027 is the month to act.

Get in touch

Let's work together

Tell us about your show and your stand space. One project lead will work with you from the first sketch to the final dismantle, and we are always happy to sign an NDA.

In-house design & build since 2001 · ESSA member · 75% of clients come back